Welcome, Jason
My Dashboard
Projects
Overview
Open Builds
Communication
Inbox
New Message
Return Home
Projects - Falcon Ridge Remodel
Open Builds
Build Status
Estimate
Proposal
Open
Closed
PROJECT INFORMATION
Project Name
Customer Name
Region
Project Manager Name
Project Manager Email
Alternate Project Manager Email
Alternate Project Manager Name
Assigned Installers:
Steven Thomas
Mike Davis
Eric Smith
John Williams
Nick Smith
Project Type
Estimated Start Date
Estimated Completion Date
Project Details
Save
LOCATION DETAILS
Project Address
Installation Type
Additional Location Notes
Save
Products
Product
Category
Manufacturer
Warranty Status
Actions
Trackman iO Duo Home
Launch Monitor
Trackman
Pending Install
π·
BenQ LK936ST Laser Projector
Projector
BenQ
1 Year Remaining
π·
JC Video High-Speed 2-Camera System
Cameras
JC Video Systems
Pending Install
π·
Carlβs Place Premium Impact Screen
Impact Screens
Carlβs Place
Pending Order
π·
Carlβs Place C-Series Pro Enclosure Kit
Enclosures
Carlβs Place
Pending Order
π·
TruGolf APOGEE Software License
Simulators
TruGolf
Not Applicable
π·
Putting Turf β Dark Green (12β x 16β)
Hitting Surfaces
Country Club Elite
Not Applicable
π·
Custom Acoustic Panels
Acoustic Panels
Residential Sound Panels
Pending Order
π·
Materials
Material
Category
Qty
Warranty
Actions
2x4 Framing Stud
Framing
β
N/A
π·
Drywall Sheet (4x8)
Drywall
β
N/A
π·
Acoustic Insulation Roll
Insulation
β
N/A
π·
Project Computer (Sim PC)
Electronics
1
Not Active
π·
Control Display Monitor
Electronics
1
Not Active
π·
HDMI Cable (25 ft)
Cabling
2
N/A
π·
π¨οΈ Print Pallet Checklist
Save
Project Tasks
Install Launch Monitor
β
β
Replace cabinet hinges (wrong color)
β©
β
Grab spare HDMI left on site
β
β
οΌ
Add Task
Save
Project Notes
Customer prefers communication via email and has requested minimal on-site disruption.
Cabinet finish must match existing bar area; verify stain color before fabrication.
Electrical outlet relocation is required prior to projector install.
Save
Docs & Images
π
Falcon-Ridge-Proposal.pdf
Uploaded Dec 12, 2025
π
Site-Measurements.pdf
Uploaded Dec 15, 2025
πΌοΈ
Existing-Space-1.jpg
Uploaded Dec 15, 2025
πΌοΈ
Existing-Space-2.jpg
Uploaded Dec 15, 2025
πΌοΈ
Install-Day-1.jpg
Uploaded Jan 22, 2026
πΌοΈ
Projector-Mount.jpg
Uploaded Jan 22, 2026
π
Electrical-Notes.pdf
Uploaded Jan 21, 2026
π
Product-Order-Confirmations.pdf
Uploaded Jan 18, 2026
οΌ
Upload File
Save
Save Project
Create New Material
Material Information
Material Name
Category
Framing
Surface
Acoustic
Electrical
Hardware
Finishing
Flooring
Add New +
Default Vendor
Cost Configuration
Cost Per Unit ($)
Square Foot Coverage (optional)
Cost Per Square Foot
Use Square Foot Calculations
Internal Cost Only
Active
Inactive
Save
Cancel
Submit
Add Task
Task Description
Save
Cancel
Save & Add Task
Upload
Project
Save
Save
Short Description
Save
Cancel
Submit
Upload
Project
Staley Hills Sim Build
Prairie Fire Project
Falcon Ridge Remodel
Save
Short Description
Save
Upload Type
Jobsite Image
Materials Receipt
Document
Other
Save
Save
Cancel
Submit