Inbox

Inbox

Status Sender Subject Project Received
Unread Marco Reyes Drywall and tape delivered Falcon Ridge Remodel 02/14/2026
Read Logan Smith TrackMan shipment arriving 2/18 Falcon Ridge Remodel 02/12/2026
Read Jake Ellis Ceiling framing approved Brookside Golf Lounge 02/13/2026
Read Chris Walker Site photos uploaded Brookside Golf Lounge 02/11/2026
Read Tyson Cole Electrical rough-in complete Lakewood Club Sim Room 02/10/2026
Read Logan Smith Impact screen delayed – 3 day ETA Lakewood Club Sim Room 02/09/2026
Read Chris Walker Acoustic panel layout attached Prairie View Basement Conversion 02/08/2026
Read Jake Ellis Flooring delivery scheduled Northland Indoor Golf Studio 02/07/2026
Read Logan Smith Confirm projector mount height Overland Park Training Bay 02/06/2026
Read Chris Walker Framing inspection passed Blue Valley Performance Center 02/05/2026
Read Jake Ellis Client walkthrough moved to 4/02 Liberty Country Club Upgrade 02/04/2026
Read Logan Smith Deposit received – ready to schedule Leawood Private Residence Bay 02/03/2026
Read Marco Reyes Ladder clearance confirmed Mission Hills Garage Sim 02/02/2026

Midwest Golf Innovations

9401 Indian Creek Pkwy, Suite 160
Overland Park, KS 66210
913.905.1485

Prepared for:Jake Thompson
By: Jake Englebrake
Created: Jan 27, 2025

Project Overview

Project Name Staley Hills Sim Build
Customer Name Jake Thompson
Location Kansas City
Project Type New Space
Estimated Start Date 04/04/25
Estimated Completion Date 08/05/25

Project Details

Single-bay commercial golf simulator installation within an existing commercial space.

Installation Location

10421 N Woodland Ave, KC, MO 64155

Proposal Summary

Products Total $48,101.00
Materials Total $3,600.00
Labor Total $1,170.00
Project Total $52,871.00
Deposit Required $26,435.50

A 50% deposit is required to secure scheduling and begin the project.

Included Products

Product Price
Putting Turf - Dark Green $420.00
Elevate - Jet Black (40 x $30.00) $1,200.00
Ace HiQ Screen™ $567.00
Trackman iO $13,995.00
Vision Standard SP $21,300.00
BenQ LK936ST $4,899.00
JC Video - 2 Cameras $5,720.00
Control Display Monitor $699.00
Project Computer (Commercial Spec) $1,850.00
Computer Cabinet $650.00
Projector Mount $189.00
HDMI Cable $29.00
DP to HDMI Cable $38.00
POE Transmitter $145.00

Included Materials

Material Price
2x4 Framing Stud $1,058.40
Drywall Sheet (4x8) $529.20
Acoustic Insulation Roll $945.00

Payment Information

Deposit Due to Begin Project

$26,435.50
  • Checks should be made payable to Midwest Golf Innovations.
  • Please reference Proposal #1048 with your payment.
  • If you need another payment option, you may request alternate payment instructions below.
  • Your project scheduling will be finalized once the required deposit has been received.

Midwest Golf Innovations

9401 Indian Creek Pkwy, Suite 160
Overland Park, KS 66210
913.905.1485

Prepared for: KC Golf Collective
By: Jake Englebrake
Created: Jan 20, 2025

Project Overview

Project Name Prairie Fire
Customer Name KC Golf Collective
Location Kansas City
Project Type Existing Space
Estimated Start Date 04/15/25
Estimated Completion Date 09/05/25

Project Details

Single-bay commercial golf simulator installation within an existing commercial space.

Installation Location

5661 W 135th St, Overland Park, KS 66223

Proposal Summary

Products Total $38,813.95
Materials Total $5,781.60
Labor Total $3,849.00
Project Total $48,444.55
Deposit Required $24,222.28

A 50% deposit is required to secure scheduling and begin the project.

Included Products

Product Price
Trackman iO Commercial $22,495.00
BenQ LK935ST Laser Projector $3,999.00
JC Video 2-Camera System $5,720.00
Carl’s Place C-Series Pro Enclosure $2,979.95
Carl’s Place Premium Impact Screen $1,795.00
Commercial Hitting Turf & Mat Package $1,650.00
Custom Acoustic Panels - Style: Tuxedo. Color: Graphite $175.00

Included Materials

Material Price
2x4 Framing Stud $1,058.40
Drywall Sheet (4x8) $529.20
Acoustic Insulation Roll $945.00
Project Computer (Commercial Spec) $2,100.00
Control Display Monitor $799.00
Cabling, Conduit & Hardware Allowance $350.00

Payment Information

Deposit Due to Begin Project

$24,222.28
  • Checks should be made payable to Midwest Golf Innovations.
  • Please reference Proposal #1045 with your payment.
  • If you need another payment option, you may request alternate payment instructions below.
  • Your project scheduling will be finalized once the required deposit has been received.

Alternate Payment Information Request

Payment Information

Submit a Question

Proposal Accepted

Your project has been successfully approved and is now moving forward.

Our team will begin preparing the next steps, including scheduling and coordination.

To keep things moving, please proceed with submitting your deposit using the payment options below.

Create New Material

Material Information


Cost Configuration

Add Task

Upload

Upload