Calendar

Project Calendar - January 2025

1
2
3
4
Brookside Golf Lounge
5
Brookside Golf Lounge
6
Brookside Golf Lounge
7
Olathe Golf Lounge
8
Olathe Golf Lounge
9
Olathe Golf Lounge
10
Olathe Golf Lounge
11
12
Blue Springs MultiBay
13
Blue Springs MultiBay
14
Blue Springs MultiBay
15
Blue Springs MultiBay
16
Blue Springs MultiBayCommercial Upgrade
17
Blue Springs MultiBayCommercial Upgrade
18
Blue Springs MultiBayCommercial Upgrade
19
Commercial Upgrade
20
Commercial UpgradeTech Suite Retrofit
21
Commercial UpgradeTech Suite Retrofit
22
Commercial UpgradeTech Suite Retrofit
23
Tech Suite Retrofit
24
Tech Suite Retrofit
25
Tech Suite Retrofit
26
Tech Suite Retrofit
27
Tech Suite Retrofit
28
Tech Suite Retrofit
29
30
31

Midwest Golf Innovations

9401 Indian Creek Pkwy, Suite 160
Overland Park, KS 66210
913.905.1485

Prepared for:Jake Thompson
By: Jake Englebrake
Created: Jan 27, 2025

Project Overview

Project Name Staley Hills Sim Build
Customer Name Jake Thompson
Location Kansas City
Project Type New Space
Estimated Start Date 04/04/25
Estimated Completion Date 08/05/25

Project Details

Single-bay commercial golf simulator installation within an existing commercial space.

Installation Location

10421 N Woodland Ave, KC, MO 64155

Proposal Summary

Products Total $48,101.00
Materials Total $3,600.00
Labor Total $1,170.00
Project Total $52,871.00
Deposit Required $26,435.50

A 50% deposit is required to secure scheduling and begin the project.

Included Products

Product Price
Putting Turf - Dark Green $420.00
Elevate - Jet Black (40 x $30.00) $1,200.00
Ace HiQ Screenโ„ข $567.00
Trackman iO $13,995.00
Vision Standard SP $21,300.00
BenQ LK936ST $4,899.00
JC Video - 2 Cameras $5,720.00
Control Display Monitor $699.00
Project Computer (Commercial Spec) $1,850.00
Computer Cabinet $650.00
Projector Mount $189.00
HDMI Cable $29.00
DP to HDMI Cable $38.00
POE Transmitter $145.00

Included Materials

Material Price
2x4 Framing Stud $1,058.40
Drywall Sheet (4x8) $529.20
Acoustic Insulation Roll $945.00

Payment Information

Deposit Due to Begin Project

$26,435.50
  • Checks should be made payable to Midwest Golf Innovations.
  • Please reference Proposal #1048 with your payment.
  • If you need another payment option, you may request alternate payment instructions below.
  • Your project scheduling will be finalized once the required deposit has been received.

Midwest Golf Innovations

9401 Indian Creek Pkwy, Suite 160
Overland Park, KS 66210
913.905.1485

Prepared for: KC Golf Collective
By: Jake Englebrake
Created: Jan 20, 2025

Project Overview

Project Name Prairie Fire
Customer Name KC Golf Collective
Location Kansas City
Project Type Existing Space
Estimated Start Date 04/15/25
Estimated Completion Date 09/05/25

Project Details

Single-bay commercial golf simulator installation within an existing commercial space.

Installation Location

5661 W 135th St, Overland Park, KS 66223

Proposal Summary

Products Total $38,813.95
Materials Total $5,781.60
Labor Total $3,849.00
Project Total $48,444.55
Deposit Required $24,222.28

A 50% deposit is required to secure scheduling and begin the project.

Included Products

Product Price
Trackman iO Commercial $22,495.00
BenQ LK935ST Laser Projector $3,999.00
JC Video 2-Camera System $5,720.00
Carlโ€™s Place C-Series Pro Enclosure $2,979.95
Carlโ€™s Place Premium Impact Screen $1,795.00
Commercial Hitting Turf & Mat Package $1,650.00
Custom Acoustic Panels - Style: Tuxedo. Color: Graphite $175.00

Included Materials

Material Price
2x4 Framing Stud $1,058.40
Drywall Sheet (4x8) $529.20
Acoustic Insulation Roll $945.00
Project Computer (Commercial Spec) $2,100.00
Control Display Monitor $799.00
Cabling, Conduit & Hardware Allowance $350.00

Payment Information

Deposit Due to Begin Project

$24,222.28
  • Checks should be made payable to Midwest Golf Innovations.
  • Please reference Proposal #1045 with your payment.
  • If you need another payment option, you may request alternate payment instructions below.
  • Your project scheduling will be finalized once the required deposit has been received.

Alternate Payment Information Request

Payment Information

Submit a Question

Proposal Accepted

Your project has been successfully approved and is now moving forward.

Our team will begin preparing the next steps, including scheduling and coordination.

To keep things moving, please proceed with submitting your deposit using the payment options below.

Create New Material

Material Information


Cost Configuration

Add Task

Upload

Upload