Projects - Falcon Ridge Remodel

PROJECT INFORMATION

Assigned Installers:

LOCATION DETAILS

Products

Product Category Manufacturer Cost Retail Labor Factor Warranty Status Actions
Trackman iO Duo Home Launch Monitor Trackman $14,995.00 $17,995.00 $800.00 Pending Install πŸ“· πŸ“§
BenQ LK936ST Laser Projector Projector BenQ $4,199.00 $4,899.00 $345.00 1 Year Remaining πŸ“· πŸ“§
JC Video High-Speed 2-Camera System Cameras JC Video Systems $5,220.00 $5,720.00 $690.00 Pending Install πŸ“· πŸ“§
Carl’s Place Premium Impact Screen Impact Screens Carl’s Place $1,395.00 $1,795.00 $420.00 Pending Order πŸ“· πŸ“§
Carl’s Place C-Series Pro Enclosure Kit Enclosures Carl’s Place $2,279.95 $2,979.95 $780.00 Pending Order πŸ“· πŸ“§
TruGolf APOGEE Software License Simulators TruGolf $1,995.00 $2,495.00 $300.00 Not Applicable πŸ“· πŸ“§
Putting Turf – Dark Green (12’ x 16’) Hitting Surfaces Country Club Elite $449.00 $699.00 $260.00 Not Applicable πŸ“· πŸ“§
Custom Acoustic Panels Acoustic Panels Residential Sound Panels $95.00 $175.00 $204.00 Pending Order πŸ“· πŸ“§

Materials

Material Category Qty Unit Price $ / Sq Ft Total Warranty Actions
2x4 Framing Stud Framing β€” $3.25 $0.89 $1,121.40 N/A πŸ“·πŸ“§
Drywall Sheet (4x8) Drywall β€” $12.75 $0.44 $554.40 N/A πŸ“·πŸ“§
Acoustic Insulation Roll Insulation β€” $28.00 $0.77 $970.20 N/A πŸ“·πŸ“§
Project Computer (Sim PC) Electronics 1 $1,850.00 β€” $1,850.00 Not Active πŸ“·πŸ“§
Control Display Monitor Electronics 1 $699.00 β€” $699.00 Not Active πŸ“·πŸ“§
HDMI Cable (25 ft) Cabling 2 $29.00 β€” $58.00 N/A πŸ“·πŸ“§

Project Totals

Project Total

$45,809.95

Products Total

$36,757.95

Materials Total

$5,253.00

Labor Total

$3,799.00

Deposit Percentage

50%

Deposit Amount

$22,904.98

Deposit Status

Full

Deposit Paid

$22,904.98
Paid on 01/10/2026

Remainder Due

$22,904.97

Project Tasks

  • Install Launch Monitor
    βœ” βœ–
  • Replace cabinet hinges (wrong color)
    ↩ βœ–
  • Grab spare HDMI left on site
    βœ” βœ–
οΌ‹ Add Task

Project Notes

Customer prefers communication via email and has requested minimal on-site disruption.

Cabinet finish must match existing bar area; verify stain color before fabrication.

Electrical outlet relocation is required prior to projector install.

Docs & Images

πŸ“„ Falcon-Ridge-Proposal.pdf Uploaded Dec 12, 2025
πŸ“„ Site-Measurements.pdf Uploaded Dec 15, 2025
πŸ–ΌοΈ Existing-Space-1.jpg Uploaded Dec 15, 2025
πŸ–ΌοΈ Existing-Space-2.jpg Uploaded Dec 15, 2025
πŸ–ΌοΈ Install-Day-1.jpg Uploaded Jan 22, 2026
πŸ–ΌοΈ Projector-Mount.jpg Uploaded Jan 22, 2026
πŸ“„ Electrical-Notes.pdf Uploaded Jan 21, 2026
πŸ“„ Product-Order-Confirmations.pdf Uploaded Jan 18, 2026