Review & Finalize Estimate

Project Summary

Customer: Jake Thompson
Project: Staley Hills Sim Build
Project Address: 1234 Fairway Dr, Kansas City, MO
Total Area: 1,260 sq ft
Prepared By: Jake
Date Prepared: January 29, 2026

Selected Products

Turf Putting Turf – Dark Green $420
Impact Screen Ace HiQ Screen $567
Panels Weave – Dark Buckskin (25 × $150) $3,750
Simulator Wave $3,995
Launch Monitor QuadMAX $19,999
Projector BenQ LK936ST $4,899
Cameras JC Video – 2 Camera System $5,720
Accessories Country Club Elite – 5x10 $1,079

Materials

Material Qty Unit Price $ / Sq Ft Calculated Total
2x4 Framing Stud $3.25 $0.89 $1,121.40
Drywall Sheet (4x8) $12.75 $0.44 $554.40
Acoustic Insulation Roll $28.00 $0.77 $970.20
HDMI Cable $29.00 $58.00
DP to HDMI Cable $38.00 $38.00
POE Transmitter $145.00 $145.00
Computer $1,850.00 $1,850.00
Screen $575.00 $575.00
Display Monitor $699.00 $1,398.00

Cost Breakdown

Product Total $40,429
Material Total $6,710.00
Labor Factor Total $3,155
Additional Labor (45 hrs @ $75) $3,375
Total Bid $53,669.00

Deposit

Project Notes

Create an Estimate - Step 11

Turf Style

Putting Turf

$100

Turf Color

Dark Green

Impact Screen

Ace HiQ Screen™

$567.00

Panel Style

Weave

Panel Color

Dark Buckskin

Launch Monitor

QuadMAX

$19,999

Simulator

Wave

$3,995.00

Projector

BenQ LK936ST

$4,899

Camera

JC Video - 2 Cameras

$5,720.00

Accessories

Country Club Elite - 5x10

$1,079.00

Notes

Create New Material

Material Information


Cost Configuration

Add Task

Upload

Upload